11 The Strand

Posted: 08-09-2014

The Brief:

To provide a fully addressable and networked system with flexibility.

Our Insight:

Seven storey office building.

Our Solution:

We supplied our full Rapid LCM system with head end.

The Result:

Occupies a prominent position at the western end of the Strand.