Channel 4 Headquarters

Posted: 08-09-2014

The Brief:

Building wide solution with scene setting, LED lighting and front end PC.

Our Insight:

The two four-storey wings contain office space accommodating up to 600 staff arranged in an L-shape.

Our Solution:

We used Rapid system throughout this project.

The Result:

The construction of the channel 4 headquarters was completed within 22 months.