Euston Tower has RAPID installed
Posted: 26-09-2014
The Brief:
Pluggable RAPID EBR-LCM10-10 and front end PC required.
Our Insight:
A 34 storey purpose-built detached office building providing unrivalled and spectacular views over Central London.
Our Solution:
Our RAPID fully addressable lighting control system along with an EBR-LCM10-10 pluggable Lighting Control Module (LCM) was implemented.
The Result:
This building provides 1 million square feet of office, retail and leisure accommodation.