Fleetbank House

Posted: 08-09-2014

The Brief:

To provide 8 floors with DALI, head end and daylight linking.

Our Insight:

13 storeys including ground and a plant floor on the top.

Our Solution:

We installed our LCM10-10DALI which is part of our Rapid system.

The Result:

A third of the glass panels on this building have solid backing to reduce solar gain. This will have such an effect that a second skin of glass will not be required.