Northampton College

Posted: 14-03-2012

The Brief:

Predominantly required daylight linking in lecture theatres, and occupancy control throughout building.

Our Insight:

New build college and education facilities.

Our Solution:

RAPID was used throughout.

The Result:

This 22,000 square metre building opened for in April 2011 and provides the latest sustainable, energy efficient technology and facilities including biomass boilers and a helical wind turbine.

View More

Northampton College, Booth Lane

This 22,000 square metre building opened for in April 2011 and provides the latest sustainable, energy efficient technology and facilities including biomass boilers and a helical wind turbine. Predominantly required daylight linking in lecture theatres, and occupancy control throughout building.