The Brief:

To install a flexible system with passive infrared presence and daylight detectors.

Our Insight:

Refurbished ten storey 2,900sqm. office building dating from the early 1930s, located on the south side of the Strand.

Our Solution:

Our RAPID system was installed along with EBR-LCM10-10DALI and passive infrared presence and daylight detectors EBR-CPIR.

The Result:

This refurbishment project cost a total of £3.5M.